Banro Resource (BNRS-C) has hit another long gold intersection at its Twangiza gold project in the Democratic Republic of Congo.
Hole 3 hit 328 metres (from 126 to 454 metres) grading 1.64 grams gold per tonne (cut to 30 grams gold), including 52 metres (from 201 to 253 metres) of 3.58 grams gold.
The hole was drilled 350 metres northeast of previously reported hole 1.
Hole 2 was abandoned.
Be the first to comment on "Banro cuts more gold"