Drilling has resumed at the Clinton copper-zinc project of New Goldcore Ventures (ME).
The Clinton property is situated in the Eastern Townships area of Quebec. It encompasses the past-producing Clinton copper mine, and contains a drill-indicated mineral reserve of 1.5 million tonnes of 2.02% copper and 1.54% zinc. Cambior (TSE) holds a 50% interest in the property.
During the current program, New Goldcore will be drilling two holes and performing borehole geophysical tests on the B zone. The work program will also include drilling and geophysical surveys to test at depth two newly discovered induced polarization (IP) anomalies.
The goal of the program is to increase reserves to a minimum of 5 million tonnes.
Be the first to comment on "New Goldcore resumes drilling at Clinton"