GOLD AND PRECIOUS METALS — Don Mario drilling nears completion

Junior Orvana Minerals (ORV-T) has nearly completed a diamond drilling program at its Don Mario copper-gold property in eastern Bolivia.

Over 82% of the planned 6,100 metres has now been drilled, with the latest results coming from holes 127 through 136. Assays from a further 21 holes are expected shortly.

Gold values varied from 4.5 grams per tonne over 0.9 metre (11.6-12.5 metres) in hole 134 to 35 grams over 2 metres (105.7-107.7 metres) in hole 130.

Highlights include: hole 128, which intersected 19.8 metres (starting from surface) grading 32.7 grams gold, including 3 metres grading 110 grams gold; hole 127, which hit 11.7 metres (111.7-123.4 metres) grading 17.2 grams; hole 131, which returned 11 metres (188.8-199.8 metres) grading 25.8 grams; and hole 132, which hit 8.8 metres (15.6-24.4 metres) grading 5.1 grams and 4.7 metres (38.5-33.2 metres) grading 16.3 grams.

The ongoing program is part of a feasibility study on the Lower Mineralized zone, which Orvana hopes to mine by a combination of underground and open-pit methods. Minable reserves are pegged at 1.47 million tonnes grading 12.95 grams gold.

Previous studies by Billiton and Pincock Allen & Holt (supplemented by subsequent drilling and in-house evaluations) indicate that the project could support a 750-tonne-per-day milling operation capable of producing 100,000 oz. gold per year for five years at a cash cost of roughly US$105 per oz.

Don Mario also hosts the Upper Mineralized zone, which holds a resource of 5.5 million tonnes grading 1.5 grams gold.

Meanwhile, BHP Minerals, a unit of Australian-based Broken Hill Proprietary, has signed a letter-of-intent to earn majority interests in several gold properties in the Altiplano region which are jointly owned by Orvana and a private Bolivian company.

The major can earn a 60% interest in the advanced Pederson property and 70% interests in nine other properties covering a total of 33,000 sq. km. BHP must cover all exploration costs and make cash payments to Orvana until a production decision is reached, along with guaranteeing development financing should any of the properties be advanced to that stage.

BHP must spend at least US$800,000 on exploration in the first year of the deal and US$1.5 million in each subsequent year. It must also pay Orvana US$200,000 or purchase 1 million shares in the second and third years, and then make payments of US$200,000 per year thereafter.

The 47.4-sq.-km Pederson property contains a resource of 51.6 million tonnes grading 1.4 grams gold per tonne, of which more than half is classified as a measured resource. A further 25 million tonnes grading 1.37 grams gold is considered a potential resource.

The resources are based on 16,769 metres in 106 reverse-circulation holes and 1,753 metres in 10 diamond drill holes completed by Orvana. A cutoff grade of 0.5 gram gold was used for the calculation.

Mineralization at Pederson is associated with stratiform bodies in folded Paleozoic sedimentary rocks along the axis and flanks of a

north-south-oriented anticline. The anticline is disrupted by northeasterly trending thrust faults and crosscut by high-angle faults striking northwesterly and northeasterly.

Orvana believes the property has the potential to host additional deposits.

Print


 

Republish this article

Be the first to comment on "GOLD AND PRECIOUS METALS — Don Mario drilling nears completion"

Leave a comment

Your email address will not be published.


*


By continuing to browse you agree to our use of cookies. To learn more, click more information

Dear user, please be aware that we use cookies to help users navigate our website content and to help us understand how we can improve the user experience. If you have ideas for how we can improve our services, we’d love to hear from you. Click here to email us. By continuing to browse you agree to our use of cookies. Please see our Privacy & Cookie Usage Policy to learn more.

Close