Work has begun on a ramp at the Moss Twp. gold property in northwestern Ontario being explored by Storimin Exploration and Tandem Resources.
The ramp will give access to planned exploration drifts at the 200-ft and 300-ft levels. In addition to the ramp work, a surface drilling program, part of this year’s $4.5-million exploration program for the property, continues. Among the better assays from recent drilling were: hole No 87-42, 0.39 oz gold per ton across 10 ft, between 560 ft and 570 ft; hole No 87-39, 0.22 oz across 10 ft, between 436 ft and 446 ft; and, hole 87-41, 0.21 oz across 25 ft, between 405 ft and 430 ft, and 0.16 oz across 3 ft, between 122 ft and 125 ft.
The Moss Twp. property is located 70 miles west of Thunder Bay.
Be the first to comment on "Ramp started at Moss Twp."