The final results from a 15-hole program include 12.66 ft grading 5.64% zinc and 42 g silver per tonne with marginal lead values. Hole 13 intersected 49.2 ft assaying 7% zinc and 56 g silver. Another 36.7-ft section graded 7.5% zinc and 12.5 g silver.
]]>
Be the first to comment on "Ego finishes program"