The Goldstream mill near Revelstoke, B.C., is back in operation. Joint owners Bethlehem Resources (TSE) and Goldnev Resources (VSE) temporarily suspended milling on March 15 in response to a narrowing of the orebody’s strike length combined with slower-than-planned underground development.
During the suspension, the main decline was advanced 110 metres, enabling operators to gain access to four additional sublevels.
An estimated 11,800 tonnes of development ore grading 4.81% copper were excavated and stockpiled on surface.
Be the first to comment on "NEWS ROUNDUP — Bethlehem’s Goldstream back in business"