Reverse-circulation and diamond drilling by
Recent drill highlights are as follows:
– hole 707D — 16.5 metres (from 154.5 metres) of 4.4 grams gold (cut);
– hole 708D — 23.5 metres (beginning 171 metres below surface) grading 7.4 grams gold per tonne;
– hole 858D — 7.5 metres (from 156.5 metres) averaging 14.4 grams;
– hole 862 — 5 metres (from 149 metres) of 25.1 grams gold;
– hole 990 — 19 metres (from 51 metres) of 4.95 grams gold;
– hole 1000 — 5 metres (from 56 metres) of 6.2 grams gold;
– hole 1016 — 9 metres (from 81 metres) of 5.2 grams gold;
High assay values were cut to 30 grams gold. The remaining holes returned grades of 1-3 grams gold over 10-30 metres.
The drilling is part of an ongoing $6.6-million effort to explore the Essakan Main zone (EMZ), which has an indicated resource of 49 million tonnes grading 1.5 grams gold per tonne, or 2.4 million oz. gold. An additional 5.7 million tonnes grading 1.7 grams gold are inferred. The figures are based on a cutoff grade of 0.5 gram gold.
Orezone will continue to test the footwall zones on 50-by-100-metre sections. Five reverse-circulation rigs and one diamond core rig are on the scene. Since August 2004, the company has sunk a total of 41,000 metres.
The EMZ will be subjected to infill drilling on 25-metre centres. Other drilling will test its down-plunge and western extension.
The partners expect to table a new resource figure in early June, with a full feasibility study slated to start in September. Conceivably, a production decision would follow in mid-2006.
Be the first to comment on "Partners extend Essakan (March 14, 2005)"