Bard Ventures’ (CBS-V, BVTLF-O) Lone Pine project, 15 km northwest of Houston, B. C., has a measured and indicated resource of 110.3 million tonnes grading 0.083% molybdenum, totalling 201.7 million lbs. moly
Inferred resources stand at 25.8 million tonnes grading 0.088% molybdenum, for about 50.1 million lbs. The cutoff grade was 0.04% molybdenum.
A headline in our Jan. 26-Feb. 1/09 edition incorrectly stated the resource at 200,000 lbs. instead of 201.7 million lbs. moly.
Be the first to comment on "Correction (February 02, 2009)"