DIAMOND PAGE — Ashton begins $10-million field program at Buffalo Hills

A winter exploration program is now underway on the Buffalo Hills diamond project in north-central Alberta.

Operator Ashton Mining of Canada (ACA-T) and joint-venture partners Alberta Energy (AEC-T) and Pure Gold Minerals (PUG-T) have set an initial $10-million exploration budget for 1998. Work will include the collection of a minimum 500-tonne bulk sample from the K14 kimberlite complex, mini-bulk sampling of the K91 kimberlite, exploration drilling of at least 15 new targets and extensive airborne geophysical surveys. The budget also includes provisions for the acquisition of a 10-tonne-per-hour dense media separation (DMS) diamond recovery plant.

During 1997, Ashton discovered 15 kimberlite bodies on the original Buffalo Hills property, 11 of which were confirmed to be diamondiferous.

A population of commercial-size diamonds were identified in the K14 complex.

In total, 7.79 carats of diamonds larger than 0.8 mm in size were recovered from an aggregate 44.87-tonne mini-bulk sample from the K14 complex, for an average grade of 17.4 carats per 100 tonnes. The seven largest stones weigh a collective 3.2 carats, representing 41% of the total carat weight. The largest diamond, a 1.31-carat stone, was described as “a single crystal, of silver-grey appearance, with many dark inclusions.”

The K14 complex was first thought to be three separate pipes, but delineation drilling suggests K14 is a single, roughly circular, complex feature that measures about 400 metres in diameter. Kimberlite in the central phase of the body is confirmed to a depth of at least 200 metres. It is covered by just 7 metres of overburden.

The K91 kimberlite lies approximately 2.5 km to the northwest of the K14 complex, beneath 14 metres of overburden. A 0.85-tonne sample collected from four core drill holes yielded a 0.301-carat parcel, for a preliminary grade of 35.4 carats per 100 tonnes. The two largest stones weighed 0.14 and 0.13 carat.

Results to date indicate a high degree of variability in diamond content from hole to hole in both the K14 and K91 kimberlites.

Ashton announced new results from mini-bulk sampling on kimberlite K6, from which a clear yellow stone weighing 0.76 carat was recovered in the early stages of processing. A 5.17-tonne sample from K6 collected from core drilling returned 0.804 carat of diamonds, for a preliminary grade of 15.5 carats per 100 tonnes.

Reverse circulation drilling into K6 recovered 4.13 tonnes of sample, which yielded 0.005 carat of diamonds, equivalent to a grade of 0.1 carat per 100 tonnes. An additional 4.65 tonnes of K6 material was collected from surface pits, returning 0.067 carat of diamonds, giving a grade of 1.4 carats per 100 tonnes.

In total, 0.876 carat of diamonds were recovered from an aggregate 13.95-tonne, mini-bulk sample of the K6 kimberlite, for a preliminary grade of 6.3 carats per 100 tonnes.

Ashton says that although only a few macrodiamonds other than the yellow stone have been recovered from K6, the presence of this stone alone indicates a need for further sampling. Ashton defines a macro as greater than, or equal to, 0.5 mm in at least one direction.

The original 1.4-million-acre Buffalo Hills property, plus 4.4 million acres of surrounding ground, is held 42.5% by Ashton, 42.5% by Alberta Energy and 15% by Pure Gold. A further 22.5-million-acre package is held 49% by Pure Gold, 25.5% by Ashton and 25.5% by Alberta Energy.

Print

Be the first to comment on "DIAMOND PAGE — Ashton begins $10-million field program at Buffalo Hills"

Leave a comment

Your email address will not be published.


*


By continuing to browse you agree to our use of cookies. To learn more, click more information

Dear user, please be aware that we use cookies to help users navigate our website content and to help us understand how we can improve the user experience. If you have ideas for how we can improve our services, we’d love to hear from you. Click here to email us. By continuing to browse you agree to our use of cookies. Please see our Privacy & Cookie Usage Policy to learn more.

Close