Lanfranchi deposit stays strong at depth

Vancouver – A drill program to test the downplunge extension of the Lanfranchi deposit in Australia is returning strong nickel grades for JV partners Brilliant Mining (BMC-V) and Sally Malay Mining (SLLYF-O, SMY-A).

The upper portion of the Lanfranchi deposit was mined out starting in the 1960s but the lower portion remained unexplored until recently. Underground drilling from the old mine is now confirming the continuation of mineralization.

Of the 27 holes completed to date, three results stand out. Hole 148 intercepted 11.3% nickel and 0.3% copper over 33 metres, starting at 96 metres depth. Diamond hole 127 returned 5.37% nickel and 0.34% copper over 24.1 metres starting 69 metres downhole, and hole 137 hit 13.8 metres grading 7.46% nickel and 0.46% copper.

The results extend the known nickel sulphide mineralization 60 metres downplunge from the lowest production level still open at depth and across widths of over 200 metres. Preliminary modeling indicates a 1 to 2 metre true thickness.

The shape of the extension as indicated by drilling falls in line with experience from past production at Lanfranchi. The orebody produced 1.4 million tonnes grading 2.32% nickel along a 1.4 km plunge, with true thicknesses ranging from 1 to 3 metres and widths between 100 and 200 metres.

Of interest, recent drilling delineated a massive nickel sulphide zone along the western margin of the extension. Hole 148, the highest grade intercept assayed to date, came from this zone. Further drilling and modeling is necessary to understand its structure.

Lanfranchi is one of five deposits holding indicated resources within the Tramsways Tenements project area. The Tramways Tenements consist of 37 mineral leases encompassing some 50 sq. km in the Kambalda nickel province in Western Australia.

The cornerstone of the Tramsways Tenements is the operational Lanfranchi mine, which is mining the Helmut South deposit. In the three months ending June 30, the mine produced 60,864 tonnes of ore grading 2.19% nickel for 1,330 tonnes nickel.

The Winner deposit, holding probable reserves of 144,000 tonne grading 4.26% nickel, is being prepped for production by the end of this year. Concurrently the Deacon deposit, with probable reserves of 1.7 million tonnes grading 2.54% nickel, is being developed, aiming for production in early 2008.

Brilliant acquired its 25% interest in the Lanfranchi mining operations in early 2006 with a takeover of private Australian company Donegal Resources, which held a one-quarter interest in the JV. Sally Malay holds the remaining 75% interest.

Print

Be the first to comment on "Lanfranchi deposit stays strong at depth"

Leave a comment

Your email address will not be published.


*


By continuing to browse you agree to our use of cookies. To learn more, click more information

Dear user, please be aware that we use cookies to help users navigate our website content and to help us understand how we can improve the user experience. If you have ideas for how we can improve our services, we’d love to hear from you. Click here to email us. By continuing to browse you agree to our use of cookies. Please see our Privacy & Cookie Usage Policy to learn more.

Close