Partners step up work at Windfall Lake

With results from the remaining holes now in hand, partners Fury Explorations (FUR-V), Alto Ventures (ATV-V) and Noront Resources (NOT-V) are preparing for their next drill campaign at the Windfall Lake project in northwestern Quebec.

The trio recently sank 17 holes, bringing to 21 the number completed since drilling began in the summer. Results from the final eight holes include the following:

— 21.3 grams per tonne over 0.24 metre of a 3-metre length of core (starting at 56 metres) that averaged 2.34 grams in hole 14;

— 1.9 grams over 0.82 metre (at 50 metres) in hole 15;

– 5.82 grams over 2.76 metres (at 94 metres) in hole 17;

— 2.15 grams over 0.22 metre (at 15.2 metres) in hole 20.

Drilling has been focused on the so-called A and B zones, each of which strikes for about 450 metres. One hole was collared at each of the C and D targets and two at the E target, between two earlier holes.

Mineralization appears to be structurally controlled (T.N.M., Nov. 21/03).

Drilling will renew when weather conditions permit.

Fury can earn a 37.5% interest in the property, which covers 5.3 sq. km in Urban Twp., about 500 metres north of the Urban Barry shear zone. The vendor, Alto, would be left with 12.5%, assuming Fury spends the required $380,000 by October 2005. The remaining stake is held by Noront.

Print

Be the first to comment on "Partners step up work at Windfall Lake"

Leave a comment

Your email address will not be published.


*


By continuing to browse you agree to our use of cookies. To learn more, click more information

Dear user, please be aware that we use cookies to help users navigate our website content and to help us understand how we can improve the user experience. If you have ideas for how we can improve our services, we’d love to hear from you. Click here to email us. By continuing to browse you agree to our use of cookies. Please see our Privacy & Cookie Usage Policy to learn more.

Close