Vancouver – Drilling by RPT Uranium (RPT-V, RMPVF-O) to test Archean iron formation rocks on its Split Rapids project in northwestern Ontarios Sibley Basin cut 6.5 metres of 0.22% U3O8.
The intercept in hole BSE07-31 came within a wider 9.65-metre interval (from 57 metres down hole) grading 0.16% U3O8.
Three holes were drilled in a fan to test the mineralized veins and fractures that cut a band of Archean iron formation and the greywacke-type metasediments on either side of it.
Mineralization in hole 31 does not appear to outcrop but is located about 25 metres northeast of a uranium-bearing vein exposed by stripping in 2005, referred to as Zone C.
In early April, RPT tabled initial results from its phase one winter drill program at Split Rapids including a high-grade interval of 4.68% U3O8 over 0.72 metres in hole BSE07-02.
Uranium mineralization discovered at Split Rapids occurs in or immediately adjacent to a 900-metre-long band of Archean iron formation. Mineralization is of Proterozoic age, and believed to be associated to an unconformity at the base of the Sibley group sediments, which have been removed by erosion in the Split Rapids area.
RPT draws analogies between the Sibley Basin and the Athabasca Basin in northern Saskatchewan, as both are of similar aged, unmetamorphosed continental sedimentary basins.
Shares of RPT Uranium traded off 3 on the July 9th drill results to close at 64 apiece. The stock posts a 52-week trading range of 22-79.
Be the first to comment on "RPT cuts more uranium at Split Rapids (July 09, 2007)"